Recharger Series Archives - CULTEC, Inc. https://cultec.com/project_tag/recharger-series/ Stormwater Management & Septic Leechfield Plastic Drainage Chambers Tue, 17 Dec 2024 20:48:23 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 RECHARGER® 150XLHD 18.5 in / 470 mmMODEL # 150XLHD https://cultec.com/products/stormwater-chamber-recharger-150xlhd/ Sun, 26 Feb 2017 04:16:35 +0000 https://cultec.codehounds.com/?post_type=project&p=520 The post RECHARGER<sup>®</sup> 150XLHD <span>18.5 in / 470 mm<br>MODEL # 150XLHD</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 150XLHD

18.5 in / 470 mm
MODEL #150XLHD

The Recharger® 150XLHD is an 18.5″ (470 mm) tall, lower profile chamber and is typically used for installations with depth restrictions or when a larger infiltrative area is required. The Recharger 150XLHD has the side portal internal manifold feature. There are two side portals on each side of the chamber. HVLV FC-24 Feed Connectors are inserted into the side portals to create the internal manifold.

show more

Available models:
  • Recharger 150XLRHD Heavy Duty Stand Alone Unit
  • Recharger 150XLSHD Heavy Duty Starter Unit
  • Recharger 150XLIHD Heavy Duty Intermediate Unit
  • Recharger 150XLEHD Heavy Duty End Unit

CULTEC StormGenie Design Tool

Design your stormwater project using our StormGenie Design Tool.
Generate accurate, project-specific CAD drawings and reports.

show less

Length 11 ft3.35 m
Width 33 in838 mm
Height 18.50 in470 mm
Installed Length 10.25 ft3.12 m
Length Adjustment per Run 0.75 ft0.23 m
Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length.
2.650 ft³/ft27.16 ft³/unit203 gal0.25 m³/m0.77 m³/unit769.12 L
Min. Installed StorageThese values are based on the installed length of the chamber. See specifications for installed length.
4.89 ft³/ft50.17 ft³/unit375 gal0.45 m³/m1.42 m³/unit1420.46 L
Min. Area Required per UnitThis is the area of the installed length of the chamber multiplied by the center-to-center spacing.
33.31 ft²3.09 m²
Min. Center-to-Center Spacing (Design Unit Width) 3.25 ft0.99 m
Max. Allowable Cover 3.66 m12 ft
Max. Inlet Opening in End Wall 12 in300 mm
Max. Allowable O.D. in Side PortalO.D. = outside dimension of pipe
10.25 in260 mm
Compatible Feed Connector HVLV FC-24 Feed Connector

The post RECHARGER<sup>®</sup> 150XLHD <span>18.5 in / 470 mm<br>MODEL # 150XLHD</span> appeared first on CULTEC, Inc..

]]>
RECHARGER®180HD 20.5 in / 521 mmMODEL # 180HD https://cultec.com/products/stormwater-chamber-recharger-180hd/ Wed, 29 Nov 2017 22:34:18 +0000 https://cultec.com/?post_type=project&p=2320 The post RECHARGER<sup>®</sup>180HD <span>20.5 in / 521 mm<br>MODEL # 180HD</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 180HD

***Now for Residential Applications!***
20.5 in / 521 mm
MODEL #180HD

Want to learn more about how to use Recharger 180HD for RESIDENTIAL DRAINAGE? Learn more

For Commercial Applications, see Recharger 150XLHD or Recharger 280HD
Our tried-and-true Recharger 180HD chamber will remain for residential stormwater applications, as its integral endwalls make this chamber the most convenient choice for smaller residential designs.

For existing and new commercial stormwater designs, please see our Recharger 150XLHD or Recharger 280HD.

The Recharger 180HD has been replaced by the Recharger 150XLHD and Recharger 280HD for COMMERCIAL applications***
Alternate products:
Recharger 150XLHD
Recharger 280HD

Want to learn more about how to use Recharger 180HD for RESIDENTIAL DRAINAGE? Learn more

Length 7.33 ft2.33 m
Width 36 in914 mm
Height 20.50 in521 mm
Installed Length 6.33 ft1.93 m
Length Adjustment per Run 1.00 ft0.30 m
Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length. 3.45 ft³/ft21.81 ft³/unit163 gal0.32 m³/m0.62 m³/unit617.47 L
Max. Allowable Cover 3.66 m12 ft
Max. Inlet Opening in End Wall

15 in

Max. Allowable O.D. in Side PortalO.D. = outside dimension of pipe

12.25 in311 mm

Compatible Feed Connector HVLV FC-24 Feed Connector

The post RECHARGER<sup>®</sup>180HD <span>20.5 in / 521 mm<br>MODEL # 180HD</span> appeared first on CULTEC, Inc..

]]>
RECHARGER® 280HD 26.5 in / 673 mmMODEL # 280HD https://cultec.com/products/stormwater-chamber-recharger-280hd/ Tue, 28 Mar 2017 23:30:11 +0000 https://cultec.codehounds.com/?post_type=project&p=773 The post RECHARGER<sup>®</sup> 280HD <span>26.5 in / 673 mm<br>MODEL # 280HD</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 280HD

26.5 in / 673 mm
MODEL #280HD

The Recharger® 280HD is a 26.5″ (673 mm) tall, mid-size stormwater management chamber and is typically used for installations with depth restrictions or when a larger infiltrative area is required. The Recharger® 280HD has the side portal internal manifold feature.

show more

HVLV™ FC-24 Feed Connectors are inserted into the side portals to create the internal manifold.

Available models:
  • Recharger 280RHD Heavy Duty Stand Alone Unit
  • Recharger 280SHD Heavy Duty Starter Unit
  • Recharger 280IHD Heavy Duty Intermediate Unit
  • Recharger 280EHD Heavy Duty End Unit

CULTEC StormGenie Design Tool

Design your stormwater project using our StormGenie Design Tool.
Generate accurate, project-specific CAD drawings and reports.

show less

Length 8.00 ft2.44 m
Width

47 in1194 mm

Height

26.50 in673 mm

Installed Length

7.00 ft2.13 m

Length Adjustment per Run

1.00 ft0.30 m

Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length.

6.079 ft³/ft42.55 ft³/unit318 gal0.56 m³/m1.21 m³/unit1204.91 L

Min. Installed StorageThese values are based on the installed length of the chamber. See specifications for installed length.

9.21 ft³/ft64.46 ft³/unit482 gal0.86 m³/m1.83 m³/unit1825.21 L

Min. Area Required per UnitThis is the area of the installed length of the chamber multiplied by the center-to-center spacing.

30.33 ft²2.82 m²

Min. Center-to-Center Spacing (Design Unit Width)

4.33 ft1.32 m

Max. Allowable Cover

3.66 m12 ft

Max. Inlet Opening in End Wall

18 in450 mm

Max. Allowable O.D. in Side PortalO.D. = outside dimension of pipe

12.25 in311 mm

Compatible Feed Connector HVLV FC-24 Feed Connector

The post RECHARGER<sup>®</sup> 280HD <span>26.5 in / 673 mm<br>MODEL # 280HD</span> appeared first on CULTEC, Inc..

]]>
RECHARGER® 300HD 30 in / 762 mmMODEL # 300HD https://cultec.com/products/stormwater-chamber-recharger-300/ Fri, 19 Apr 2024 16:50:27 +0000 https://cultec.com/?post_type=project&p=4275 The post RECHARGER<sup>®</sup> 300HD <span>30 in / 762 mm<br>MODEL # 300HD</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 300HD

30 in / 762 mm
MODEL # 300HD

The Recharger® 300HD is a 30″ (762 mm) tall, high capacity plastic stormwater management chamber. Typically when using this model, fewer chambers are required resulting in less labor and a smaller installation area. The Recharger® 300HD has the side portal internal manifold feature. HVLV™ FC-24 Feed Connectors are inserted into the side portals to create the internal manifold.

show more

Available models:

  • Recharger 300HD Heavy Duty Chamber
  • Recharger 300HD End Cap

CULTEC StormGenie Design Tool

Design your stormwater project using our StormGenie Design Tool.
Generate accurate, project-specific CAD drawings and reports.

show less

Length

7.54 ft2.29 m

Width

51 in1295 mm

Height

30 in762 mm

Installed Length

7.08 ft2.16 m

Length Adjustment per Run

0.46 ft0.14 m

Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length.

6.53 ft³/ft46.27 ft³/unit346 gal0.61 m³/m1.31 m³/unit1310 L

Min. Installed StorageThese values are based on the installed length of the chamber. See specifications for installed length.

10.51 ft³/ft74.44 ft³/unit566 gal0.98 m³/m2.11 m³/unit2143 L

Min. Area Required per UnitThis is the area of the installed length of the chamber multiplied by the center-to-center spacing.

33.63 ft²3.12 m²

Min. Center-to-Center Spacing (Design Unit Width)

4.75 ft1.45 m

Max. Allowable Cover

3.66 m12 ft

Max. Inlet Opening in End Wall

24 in600 mm

Max. Allowable O.D. in Side PortalO.D. = outside dimension of pipe

10 inch HDPE, 12 inch PVC250 mm HDPE, 300 mm PVC

Compatible Feed Connector

HVLV FC-24 Feed Connector

The post RECHARGER<sup>®</sup> 300HD <span>30 in / 762 mm<br>MODEL # 300HD</span> appeared first on CULTEC, Inc..

]]>
RECHARGER® 330XLHD 30.5 in / 775 mmMODEL # 330XLHD https://cultec.com/products/stormwater-chamber-recharger-330xlhd/ Thu, 30 Mar 2017 11:33:07 +0000 https://cultec.codehounds.com/?post_type=project&p=818 The post RECHARGER<sup>®</sup> 330XLHD <span>30.5 in / 775 mm<br>MODEL # 330XLHD</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 330XLHD

***Still available for Residential Applications!***
30.5 in / 775 mm
MODEL # 330XLHD

Want to learn more about using Recharger 330XLHD for RESIDENTIAL DRAINAGE? Learn more

For Commercial Stormwater Applications, see Recharger 300HD
Our tried-and-true Recharger 330XLHD chamber will remain for residential stormwater applications, as its integral endwalls make this chamber the most convenient choice for smaller residential designs.

For existing and new commercial stormwater designs, please see our NEW Recharger 300HD

The Recharger 330XLHD is still available for RESIDENTIAL applications.

Questions? Contact your local rep

***The Recharger 330XLHD has been replaced by the NEW Recharger 300HD for COMMERCIAL applications***
Alternate product:
Recharger 300HD

Recharger 330XLHD to NEW Recharger 300HD Comparison Chart View

Length 8.50 ft2.59 m
Width 52 in1321 mm
Height 30.50 in775 mm
Installed Length 7.00 ft2.13 m
Length Adjustment per Run 1.50 ft0.46 m
Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length. 7.459 ft³/ft52.21 ft³/unit391 gal0.69 m³/m1.48 m³/unit1478.44 L
Max. Allowable Cover 3.66 m12 ft
Max. Inlet Opening in End Wall 24 in600 mm
Max. Allowable O.D. in Side PortalO.D. = outside dimension of pipe 11.75 in298 mm
Compatible Feed Connector HVLV FC-24 Feed Connector

The post RECHARGER<sup>®</sup> 330XLHD <span>30.5 in / 775 mm<br>MODEL # 330XLHD</span> appeared first on CULTEC, Inc..

]]>
RECHARGER® 360HD 36 in / 914 mmMODEL # 360HD https://cultec.com/products/stormwater-chamber-recharger-360hd/ Sun, 15 Jul 2018 22:34:49 +0000 https://cultec.com/?post_type=project&p=2535 The post RECHARGER<sup>®</sup> 360HD <span>36 in / 914 mm<br>MODEL # 360HD</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 360HD

36 in / 914 mm
MODEL # 360HD

The Recharger® 360HD is a 36″ (914 mm) tall, high capacity chamber. Typically when using this model, fewer chambers are required resulting in less labor and a smaller installation area. The Recharger® 360HD has the side portal internal manifold feature. HVLV® FC-48 Feed Connectors are inserted into the side portals to create the internal manifold.
Contractors are able to hand place the units on-site, unlike larger, more cumbersome competitive products.

Meets ASTM F3430, F2418 and F2787 standards.

CULTEC StormGenie Design Tool

Design your stormwater project using our StormGenie Design Tool.
Generate accurate, project-specific CAD drawings and reports.

ADDITIONAL BENEFITS
Value engineered design for maximum cost savings.
Adheres to AASHTO LRFD Design Standards.
55% more storage per foot over the leading 30″ high competitor chamber.
8.6% more storage per foot over 42″ HDPE pipe.

Length

4.17 ft1.27 m

Width

60 in1525 mm

Height

36 in914 mm

Installed Length

3.67 ft1.12 m

Length Adjustment per Row – with two end caps installed

2.50 ft0.76 m

Length Adjustment per Row – when not using end caps

.50 ft0.15 m

Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length.

10.00 ft³/ft36.66 ft³/unit.929 m³/m1.038 m³/unit

Min. Installed StorageThese values are based on the installed length of the chamber. See specifications for installed length.

15.199 ft³/ft55.73 ft³/unit1.412 m³/m1.58 m³/unit

Min. Area RequiredThis is the area of the installed length of the chamber multiplied by the center-to-center spacing.

21.08 ft²1.96 m²

Min. Center-to-Center Spacing

5.75 ft1.75 m

Max. Allowable Cover

3.66 m12 ft

Max. Allowable O.D. in Side PortalO.D. = outside dimension of pipe

11.5 in292 mm

Compatible Feed Connector

HVLV FC-48 Feed Connector

Compatible End Cap

Recharger 360HD End Cap

The post RECHARGER<sup>®</sup> 360HD <span>36 in / 914 mm<br>MODEL # 360HD</span> appeared first on CULTEC, Inc..

]]>
RECHARGER® 360HD END CAP Compatible with Recharger 360HDMODEL # 360HD EC https://cultec.com/products/360hd-ec/ Mon, 16 Jul 2018 14:19:28 +0000 https://cultec.com/?post_type=project&p=2542 The post RECHARGER<sup>®</sup> 360HD END CAP <span>Compatible with Recharger 360HD<br>MODEL # 360HD EC</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 360HD END CAP

Compatible with Recharger 360HD
MODEL # 360HD EC

The Recharger 360HD End Cap is used with the Recharger 360HD Stormwater Chamber to cap the end of chamber rows.

Length

18 in458 mm

Width

60 in1525 mm

Height

36.5 in927 mm

Installed Length

15 in381 mm

End Cap StorageThese values are based on the installed length of the chamber. See specifications for installed length.

5.17 ft³/ft6.46 ft³/unit0.48 m³/m0.183 m³/unit

Min. Installed StorageThese values are based on the installed length of the chamber. See specifications for installed length.

12.4 ft³/ft15.50 ft³/unit1.15 m³/m0.44 m³/unit

Max. Inlet Opening in End Wall

24 in HDPE or 30 in PVC600 mm HDPE or 750 mm PVC

Request Information

The post RECHARGER<sup>®</sup> 360HD END CAP <span>Compatible with Recharger 360HD<br>MODEL # 360HD EC</span> appeared first on CULTEC, Inc..

]]>
RECHARGER® 902HD 48 in / 1219 mmMODEL # 902HD https://cultec.com/products/stormwater-chamber-recharger-902hd/ Thu, 30 Mar 2017 20:30:18 +0000 https://cultec.codehounds.com/?post_type=project&p=862 The post RECHARGER<sup>®</sup> 902HD <span>48 in / 1219 mm<br>MODEL # 902HD</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 902HD

48 in / 1219 mm
MODEL # 902HD

The Recharger® 902HD is a 48″ (1219 mm) tall, ultra-high capacity chamber which has been designed and tested in accordance with ASTM F3430-20, “Specification for Cellular Polypropylene (PP) Corrugated Wall Stormwater Collection Chambers” and ASTM F2787 “Standard Practice for Structural Design of Thermoplastic Corrugated Wall Stormwater Collection Chambers”. Following rigorous tests including measurement of short-and long-term physical properties, and live and dead loading, the Recharger 902HD meets the performance requirements of ASTM F3430-20 and F2418, and meets the demands of the factored loads defined by AASHTO Section 12 LFRD and the CAN/CSA-S6-14 CL-625 Design Truck.


The Recharger 902HD has received its third-party certification to the Canadian standard, CSA B184.2-11: Polymeric subsurface stormwater management structures. Material and structural testing was performed at the highest level to ensure lasting performance of the chambers for years to come. CULTEC is committed to providing products that meet the demands of today’s industry. Check out our listing.

show more

Typically when using this model, fewer chambers are required resulting in less labor and a smaller installation area. The Recharger 902HD has the side portal internal manifold feature. HVLV® FC-48 Feed Connectors are inserted into the side portals to create the internal manifold.

CULTEC StormGenie Design Tool

Design your stormwater project using our StormGenie Design Tool.
Generate accurate, project-specific CAD drawings and reports.

The Recharger 902HD is available in only one model type and is open on both ends.
A separate end cap is required with this unit (sold separately) to cap the ends of rows.

show less

Length

4.25 ft1.30 m

Width

78 in1981 mm

Height

48 in1219 mm

Installed Length

3.67 ft1.12 m

Length Adjustment per Run

1.03 ft0.31 m

Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length.

17.31 ft³/ft63.47 ft³/unit1.61 m³/m1.80 m³/unit

Min. Installed StorageThese values are based on the installed length of the chamber. See specifications for installed length.

27.06 ft³/ft99.28 ft³/unit2.53 m³/m2.81 m³/unit

Min. Area Required per UnitThis is the area of the installed length of the chamber multiplied by the center-to-center spacing.

26.58 ft²2.47 m²

Min. Center-to-Center Spacing (Design Unit Width)

7.25 ft2.21 m

Max. Allowable Cover

2.53 m8.3 ft

Max. Inlet Opening in End Wall

24 in600 mm

Max. Allowable O.D. in Side PortalO.D. = outside dimension of pipe

11.5 in292 mm

Compatible Feed Connector

HVLV FC-48 Feed Connector

Compatible End Cap

Recharger 902HD End Cap

The post RECHARGER<sup>®</sup> 902HD <span>48 in / 1219 mm<br>MODEL # 902HD</span> appeared first on CULTEC, Inc..

]]>
RECHARGER® 902HD END CAP Compatible with Recharger 902HDMODEL # 902HD EC https://cultec.com/products/902hd-ec/ Thu, 30 Mar 2017 19:23:45 +0000 https://cultec.codehounds.com/?post_type=project&p=877 The post RECHARGER<sup>®</sup> 902HD END CAP <span>Compatible with Recharger 902HD<br>MODEL # 902HD EC</span> appeared first on CULTEC, Inc..

]]>

Stormwater Systems

RECHARGER® 902HD END CAP

Compatible with Recharger 902HD
MODEL # 902HD EC

The Recharger 902HD End Cap is used with the Recharger 902HD Stormwater Chamber to cap the end of chamber rows.

Length 2.33 ft0.71 m
Width 78 in1982 mm
Height 48.5 in1231 mm
Installed Length 2.00 ft0.61 m
Chamber StorageThese values are based on the installed length of the chamber. See specifications for installed length. 9.01 ft³/ft18.02 ft³/unit0.83 m³/m0.51 m³/unit
Min. Installed StorageThese values are based on the installed length of the chamber. See specifications for installed length. 22.08 ft³/ft44.16 ft³/unit2.05 m³/m1.25 m³/unit
Max. Inlet Opening in End Wall 24 in600 mm

Request Information

The post RECHARGER<sup>®</sup> 902HD END CAP <span>Compatible with Recharger 902HD<br>MODEL # 902HD EC</span> appeared first on CULTEC, Inc..

]]>